Delivering a busbar system capable of supplying peak currents up to 435kA
The challenge
The system had to fit and mount into an existing tunnel network with a requirement for a low and known inductance. With these kinds of extreme currents and the associated forces, many months of calculations were required to ensure that the system would work, and work well, from its first switch on, to ensure no damage to the attached equipment.
The results
With the client happy and the system working well, Elmecon were again requested to design and develop the next stages of the client’s system in the following years.